USDT第三方支付

菜宝钱包(caibao.it)是使用TRC-20协议的Usdt第三方支付平台,Usdt收款平台、Usdt自动充提平台、usdt跑分平台。免费提供入金通道、Usdt钱包支付接口、Usdt自动充值接口、Usdt无需实名寄售回收。菜宝Usdt钱包一键生成Usdt钱包、一键调用API接口、一键无实名出售Usdt。

choi Baccarat

sàn casino đổi thưởng tiền mặt uy tín SỐ 1 ,Bạn có thể nạp và rút tiền với; Ví điện tử ; đồng tiền ảo; usdt; an toàn tiện lợi và có độ bảo mật cao. Mọi thông tin chi tiết xin liên hệ URL:www.vng.app。

,

KUALA LUMPUR: Ageson Bhd said Ferrier Hodgson MH Sdn Bhd has completed the forensic audit exercise on the costs incurred by Prinsiptek (M) Sdn Bhd (PMSB), a former wholly-owned subsidiary of the group.

Ageson, in a statement said, the audit had further strengthened the basis of Ageson’s civil suit against its former managing director and six other individuals for deliberate breach of statutory duty.

The findings were based on a construction contract awarded to PMSB in 2016 for a 44-storey apartment block, together with a 8-storey car park podium and amenities in Sentul, Kuala Lumpur.

The contract, which was awarded by Qaiser Harta PMC, has a value of RM330.3mil.

Based on Ferrier Hodgson’s findings, the construction project was awarded on Nov 17, 2016 while development order for the project was obtained on Dec 6, 2016 and revised on Oct 31, 2017.

It noted that drawings and buildings plans were secured by PMSB prior to the incorporation of MH Maju Holdings Sdn Bhd on Aug 29, 2017.

“The letter of awards to MH Maju, dated Sept 14, 2016, Dec 1, 2016 and April 4, 2017, could not have been issued by PMSB as MH Maju and the title of the project were not in existence at that material point in time,” it said.

Ferrier Hodgson has found that PMSB only issued one progress billing for the sum of RM11.5mil to Qaiser Harta PMC in FY2018.

PMSB then charged a portion of the costs of RM8.8mil and profit of RM2.6mil in FY2018.

In addition, it noted that the construction cost of RM23.7mil incurred by PMSB as at June 30, 2019 did not commensurate with the progress billing issued by the quantity surveyor of the project. The surveyor had certified preliminaries works of only RM2.8mil and piling works of RM8.6mil for the project as at Nov 22, 2017.

More than 93% of the payments or RM22.6mil made by PMSB as at Oct 31, 2019 were payments for consultancy fees to MH Maju (67.3%) and Rapi Mulia Sdn Bhd (26.0%).

“Other than the 11 invoices issued by MH Maju and the progress work certification issued by PMSB, Ferrier Hodgson has not sighted any other documentary evidence that could substantiate the basis of the invoices issued by MH Maju, and the value of workdone by MH Maju that was certified by PMSB,” it said.

Numerous cheques were issued to MH Maju and cleared for payment by the bank on the same day and there were on a few occasions cheque receipts with identical amounts to the cheques issued to MH Maju, deposited into PMSB’s bank account immediately after PMSB’s cheques to MH Maju were cleared for payment.

MH Maju is a company involved in machinery rental and leasing, and Rapi Mulia is a project contractor.

Allbet Gaming声明:该文看法仅代表作者自己,与www.allbetgame.us无关。转载请注明:choi baccarat(www.vng.app):Ferrier Hodgson completes forensic audit on Ageson’s suit against its former managing director
发布评论

分享到:

怎么买usdt便宜(www.payusdt.vip):全球Q1移动应用讲述出炉:TikTok和《绝地求生》仍占领榜首
你是第一个吃螃蟹的人
发表评论

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。